| Term | Description |
|---|
| SC. | System Controller. |
| Select Retailer Notification (SRN) | The SRN notifies the Retailer of enrollment status. A code of 0000 indicates a successful enrollment. For complete details on the SRN transaction codes, please see the Settlement System Code, available athttp://www.aeso.ca/loadsettlement/349.html. |
| Self-Generation | Generation of electricity by a customer for their own use. |
| Service Charge | The current balance of fees payable to service provider. |
| Settlement As At Date | Date and time that all data used by this settlement run was in the settlement system. Supports reproducibility of settlement at a later time than the 'original' settlement run. This allows the same data to be used regardless of how many times a run is performed. The standard Date format has been defined as: YYYYMMDDHHMISS. |
| Settlement ID | A 4-digit number uniquely representing each Load Settlement Agent operating within Alberta. LSA IDs are prefixed with a "1". |
| Settlement ID - 1040 | FORTIS |
| Settlement ID - 1050 | Lethbridge |
| Settlement ID - 1070 | Red Deer |
| Settlement ID - 1080 | Ponoka |
| Settlement ID - 1090 | Fort MacLeod |
| Settlement ID -1010 | ATCO |
| Settlement ID -1020 | ENMAX |
| Settlement ID -1030 | EPCOR |
| Settlement ID -1060 | Crowsnest Pass |
| Settlement ID -1100 | Cardston |
| Settlement Interval | The settlement interval is the time increment at which distinct load estimates are calculated by load settlement systems and load amounts are settled financially by the Pool. |
| Settlement Ready Data | Data that is ready for use in settlement. Data shall be validated, estimated and edited as outlined in the standards, and aggregated or totalized to measurement point data as per the Measurement Point Definition records. |
| Settlement Run Date | Date and time settlement was initiated. This date does not indicate which date was used by the settlement run. The standard Date format has been defined as: YYYYMMDDHHMISS. |
| Settlement System | A settlement system is a computer system and associated operations and interfaces used to determine the load responsibility at each unit of the settlement interval, for each retail supplier operating within the settlement zone. |
| Settlement Timing | Settlement timing is the frequency at which load settlement is calculated and reported to the Pool and to retailers. |
| Settlement Type | The settlement type is the time interval at which distinct load estimates are calculated by load settlement systems and load amounts are settled financially by the Pool: I - Initial Daily Settlement; M - Initial Monthly Settlement; R - Reconciliation Settlement; F - Final Settlement. |
| Settlement Zone | The settlement zone is the collection of sites that are jointly settled by a settlement system and over which UFE is calculated and allocated. For example Alberta has 10 different zones. |
| Seven 7x16 (MW) | A standard hedge block offered by retailers for sixteen hours a day 9 am to midnight, on hour ending), seven days a week. Size is negotiated. |
| Seven 7x24 (MW) | A standard hedge block offered by retailers for twenty-four hours a day, seven days a week. Size is negotiated. |
| Short Term Trade | Electricity trade of varying duration that involves only surplus electricity from existing generating and transmission facilities. |
| SIR | Site ID Result. |
| Site | A unique end-use service delivery point. This is the finest level at which settlement recognizes Retailer assignments, and receives consumption data. |
| Site ID | A Site ID possesses the following characteristics: 1. A Site ID can be enrolled by a Retailer; 2. Consumption is allocated at the Site ID; 3. Settlement occurs at the level of Site ID. |
| Site Type Chart | The Site Type Chart differentiates total load into size components. TA sites represent the very large sites connected to the transmission system. TA sites are on interval meters and are not charged for Loss or UFE. DIM load profile represents larger sites (over 500 kW) that have interval meters. DIM sites have lower loss factors and the hourly profile is determined by physical consumption. A large DIM load profile means there are few large sites making up most of your load, hourly profile is controllable and Loss is less significant. A large DCM load profile means you have many small sites, profile is fixed and Loss is more significant. |
| Slamming | A term used in the industry to indicate that another Retailer has taken the site without the knowledge of the original Retailer. |
| SMC | Site Metering Characterics. |
| Socket | A socket is a point at which a physical meter is installed. Settlement identifies sockets by the Socket ID. In many cases the Socket ID and the Site ID refer to the same point. However, there are some physical constructs that exist in Alberta where there is more than one Socket ID representing a Site ID. |
| Socket ID | A Socket ID is a point at which a physical meter is installed. In many cases the Socket ID and the Site ID refer to the same point. However, there are some physical constructs that exist in Alberta where there is more than one Socket ID representing a Site ID. |
| SOLR | Supplier of Last Resort. |
| Source File Key_SRN | The name of the file containing the SRN transaction. |
| Sparkspread | Sparkspreads give an indication of the revenue available to cover costs after fuel costs have been paid. A positive spread indicates it is more economical to buy gas and generate electricity while a negative spread indicates it is more economical to buy electricity from the grid. |
| SPI | Settlement Profile Information. |
| Spinning Reserve | A type of ancillary service in which unused capacity of a generating unit, when synchronized to the interconnected electrical system, is held in standby and in readiness to deliver electric energy upon receipt of instructions from the system controller. |
| Spot Trading Charge | A charge per MWh on energy bought and sold through the Power Pool at real time. |
| SRN | Select Retailer Notification. This is a transaction sent from the LSA to the retailer to notify the enrollment results. |
| SRO | Notify Old Retailer. This is a transaction send from the LSA to the old retailer notifying them they had lost the site to another retailer. |
| SRR | Select Retailer Request. This is the transaction that a retailer sends to request a retailer switch from the LSA. |
| SRW | Settlement (LSA) Notify Wires and MDM. Notify the wires and MDM of a retailer switch. |
| SSI | Settlement Summary Information. |
| SSR | Search Site ID Request. |
| Statement Charge | Consists of any number of charges that were not charged at the site level. For example: forward contract, map differences, miscellaneous charges such as digital certificates, etc. |
| STC | Spot Trading Charge. |
| Stranded costs/investment | Utility assets that would lose value in a competitive market. |
| Supplemental Reserve | A type of ancillary service in which unused capacity of a generating unit, which at the time may or may not be synchronized to the interconnected electrical system, is held on standby and in readiness to deliver electric energy upon receipt of instructions from the system controller. |
| Surcharge Amount | Includes uplift , spot trading charge and agency fees. |
| Switch Date | Date and time the site is enrolled with the Retailer. |
| Switch Off Date | RISS field used to capture when a Notify Old Retailer (SRO) transaction is received for the Retailer for a Site ID. |
| System Access | The charge based on Transmission (kWh) for the customer to have system access service from the ISO. |
| System Access Flat | The flat rate charge based on demand for the customer to have system access service from the ISO. |
| System Interval Meters | All interval meters that are defined by the Transmission Administrator to be part of the transmission system, and are used in determining the energy flows of the transmission system. |
| System Level | Hourly values for the distribution interchange, distributed generation, and border customer consumption that are needed to describe the total hourly energy flow on the AIES at the transmission level and the inputs and outputs to each and every distribution settlement zone for each hour. |
| System Residual Profile | Includes uplift , spot trading charge and agency fees. Report column heading: SURCHARGE_AMT. EPSS x-ref: at the point of distribution, minus the (possibly loss-adjusted) total of interval-metered loads, is taken as the load profile for all customers within the point of delivery (POD). The method can also be applied at the distribution system or load isolation zone level rather than at individual distribution points. |